WKS-BDMS2000 Building Electrical Equipment Monitoring and Management System Expert Symposium Successfully Held

1
On January 13, 2018, an expert symposium on new products of "YSK2S Building Electrical Equipment Integration Device" and "WKS-BDMS2000 Building Electrical Equipment Monitoring and Management System" developed by Suzhou Wanlong Electric Group Co., Ltd. was held in Suzhou. The participating experts listened to The report of the project team

On January 13, 2018, a new product expert symposium on "YSK2S Building Electrical Equipment Integrated Device" and "WKS-BDMS2000 Building Electrical Equipment Monitoring and Management System" developed by Suzhou Wanlong Electric Group Co., Ltd. was held in Suzhou. The participating experts listened After the report of the project team, watched the product field test, after discussion at the meeting, they agreed:

1. YSK2S new products and WKS-BDMS2000 building electrical equipment monitoring and management system conform to the development direction of national building electrical equipment and control system. It integrates the functions of traditional power distribution components, power meters, DDC controller and motor protector, and can gradually replace the distributed local control and background centralized management functions of building BA system.

2, YSK2S integrated device and WKS-BDMS2000 building electrical equipment monitoring and management system has the following advantages:

(1) Multi-system and multi-component integration: YSK2S series devices innovatively integrate a variety of power distribution and control components and multi-system function optimization into an integrated device to realize the integration of protection, control, measurement and communication of equipment circuits such as fans or pumps;

(2) the design, installation, use is simple and reliable: the system design is simple, no complicated primary wiring and secondary wiring, installation and maintenance is simple and convenient, has solved the building electrical power distribution and control in the component function duplication, resource waste, wiring complex, after the completion of the maintenance of inconvenience;

(3) Energy saving and consumption reduction, investment reduction: save the materials of the equipment in the control cabinet, the integrated device reduces the size of the control cabinet, saves the labor cost of design, installation, commissioning and maintenance, and has significant energy saving and consumption reduction effects. The investment in intelligent building control system is greatly reduced, which is lower than the 50% of investment in traditional building control system;

3, "WKS-BDMS2000 building electrical equipment monitoring and management system" is applicable to all new and rebuilt building electrical equipment control and management.

4, the emergence of WKS-BDMS2000 systems is a disruptive innovation in the field of building electrical equipment control, filling the gap in the industry.

Product Details

Products

Pre-assembled DC traction solution for surface mining transportation